Conventional inflation method for accumulators

66 Published by admin 1月 03,2018

General can be used according to the accumulator use instructions and the method that the equipment uses the instruction to introduce the method to carry on.Use the inflatable tool to fill the accumulator with nitrogen.

Accumulator inflator

Accumulator inflator

Accumulator charging before accumulator inlet slightly up, about 1/10 of the hydraulic oil into the shell volume, so that lubrication, connect one end of the pneumatic tools on the accumulator charging valve, the other end connected with nitrogen gas bottle.

To dropoff cut-off valve, adjust its exports, pressure to 0.05-0.1 MPa, rotate the handles on the pneumatic tools, slowly open the charging valve core, slowly nitrogen, will slowly opened the assembly of the folded airbags, make the balloon expands gradually, until the poppet valve is closed. At this point, the aeration velocity can be accelerated and the required charge pressure is reached. Do not inflate the air into the airbag at once to avoid inflating the air balloon during the inflating process. If the accumulator air pressure is high, the charging system should be equipped with a supercharger.

At this point, the other end of the inflatable tool is connected to the supercharger. Air temperature is reduced, in the process of air after completion, and achieve the required pressure should be about 20 min, temperature stability, such as measuring inflation pressure again, and make the necessary corrections, and then close the charging valve, unload pneumatic tools.

The accumulator is to be tested after aeration 24 hours, the normal work in the future also needs to check regularly, check whether the accumulator leak gas.

Alibaba March expo

Dear Sir or Madam, We are so glad to inform you that there is an online promotion held by Alibaba...

Do you like ?66

Read more

Electronic commerce normal enterprise.

According to the general office of the people’s government of hebei province on promoting c...

Do you like ?66

Read more

Celebrate the establishment of the party branch

On the morning of January 22, 2018, the party branch was held in our company. Our president and g...

Do you like ?66

Read more

Belarusian clients visit our company.

  Zhuolu high pressure vessel co., LTD.always adhere to the most sincere service attitude, the mo...

Do you like ?66

Read more

Korean clients visit ZP company.

On January 8, 2018, South Korea FLOWFORCE CO., LTD.visit our company and do the business investig...

Do you like ?66

Read more

ASME Certification

Our company successfully obtained the ASME certificate on December 22, 2017.

Do you like ?66

Read more

Conventional inflation method for accumulators

General can be used according to the accumulator use instructions and the method that the equipme...

Do you like ?66

Read more

Company Profile

Zhuolu High Pressure Vessel Co., Ltd has a history of nearly 40 years in pressure vessel line whi...

Do you like ?66

Read more

    [recaptcha]

    code

    Alibaba international station web site
    https://cylinder.en.alibaba.com/

    zhuolu high pressure Copyright All Rights Reserved Technical support:Baiila Sitemap